Thursday, July 9, 2009

Almost Finished!











Jeff's dad has been working hard on the basement and now it is looking like the end is near. :) Jim did most of the drywall on is own with help from Jeff, Stephen, and Matt. And Jim, Brad and Jeff primed and painted. We had someone come in and do the taping of the drywall and on Tuesday we are having the floors measured for the carpets. Then probably on Friday the person we have doing the finishing carpentry will be here, and all the doors and trim will be installed, as well and the railing to the stairs and probably a ton of other things I'm forgetting. :) We also have someone coming to tile the bathroom (he is a plumber too so he will finish the work he started in the bathroom and install the toilet, shower fixtures, etc). We are thankful to have friends and family who are helping us get the basement done at a much lower cost. Even our electrician is a friend of ours. We are matching everything to upstairs so it'll really have a finished look when it's all done.

1. Caden's room
2. Front hallway
3. Playroom/Family Room (this is the space we are most excited about)
4. Caden's Room again
5. Jeff's Office (I bet he is most excited about this space! I didn't get the best shot. There is a fair bit of room in there)
6. The washer and dryer are pulled put b/c they are painting. We're just going to put double doors in front of them.
7. Caden at the top of the stairs
8. Caden's bathroom (Cayleigh will have her own bathroom by her bedroom upstairs which will be nice)
9. Playroom/ Family Room again

I would like to give a special thank you to my model of the basement photoshoot, Caden Jones. :D

No comments: